• INVESTMENT IN SALASPILS DISTRICT

Investment Catalog

  • In order to build successful and constructive cooperation between you as a potential co-operation partner and the Salaspils Municipality, we invite you to contact Salaspils County Municipality's contacts to discuss your business development ideas and opportunities in the relevant land unit. For contact details, please refer to the section "Contacts".

  • Back
    Real EstateMunicipality
    Cadastre80110020021
    AddressLazdu iela 1B, Salaspils
    Access roadSoil
    PlaceCity
    Area6.6297
    UseIndustrial territory
    Cadastre value9282 EUR

    Utilities:

    There is no opportunity to connect to SIA “Salaspils Siltums” heat supply networks. No opportunity to connect to PSIA "Valgums-S" water and sewerage networks. To find out about electricity connection opportunities, send an electronic application at the AS “Sadales tīkls” webpage www.sadalestikls.lv

    Location:

    The land lot is located in Salaspils municipality, north part (by the city border) and borders with Lazdu iela street (gravel surface). Distance to A4 – 6 km (in the direction of Saurieši – A4), to A6 – 3.2 km, to Salaspils town centre – 3.5 km.

    Access:

    There is access to the land lot from Lazdu iela street owned by the municipality, which has gravel surface.

    Public transport:

    Bus stop – 1,2 km; train station “Salaspils” – 2,2 km.

    Description:

    The land lot has partially level relief. There is a forest on the land..

    At an industrial territory, on each land unit, it is allowed to construct one or several:

    - industrial manufacturing buildings;

    - reservoirs, bunkers, silos and warehouse buildings;

    - elevator – warehouse company buildings;

    - car parks;

    - industrial manufacturing buildings intended for car repair workshops or car washes.

    The following building requirements are observed at industrial territories:

    - maximum building height is 15 metres from terrain level on the façade or entrance side of the road to the roof ridge or the highest side of the parapet (for flat roofs) if another height is not determined by technological necessity;

    - maximum number of levels is 4 levels if another building construction principle is not determined by technological necessity;

    - maximum building intensity of the land unit does not exceed 150%;

    - free territory – 10% from the land unit area;

    At an industrial territory, a land unit may be isolated with a dense non see-through fence, the height of which does not exceed 2.2 metres.